{len(PROJECTS)} projects across solar, battery storage, hydrogen, data centers, EV, factories, and logistics. Filter by category, search by name or keyword, sort by capacity, status, or year.

PV + BESS Braila Cluster
Permitting · 2027

Braila Cluster

Brăila County, Romania

Hybrid renewable cluster: 18 MWp solar PV paired with a 137.5 MWh battery energy storage system (4-hour duration). Grid-scale dispatch across aFRR, mFRR, and day-ahead markets via our VPP platform.

18 MWp PV + 34.4 MW / 137.5 MWh BESS
BESS BESS City Braila
Permitting · 2027

BESS City Braila

Brăila, Romania

Standalone battery energy storage system, 50 MWh capacity with 4-hour duration. Urban-adjacent siting optimised for frequency response, grid services, and peak-shaving revenue.

12.5 MW / 50 MWh BESS (4-hr)
EV Energy Equipment Showroom
Under Construction · 2026

Energy Equipment Showroom

Tunari, Ilfov, Romania

800 m² showroom on a 4,400 m² site showcasing the future of electric construction equipment. A premier hub for sustainable technology and zero-emission efficiency.

800 m² / 4,400 m² site
Factories Production & Recycling Center
Under Construction · 2027

Production & Recycling Center

Dascălu, Ilfov, Romania

8,492 m² cluster integrating 2,000 m² of EV charger and battery production with PV panel recycling. Drives the circular economy by merging clean energy manufacturing with material recovery.

8,492 m² cluster
Logistics Distribution & Logistics Center
Permitting · 2027

Distribution & Logistics Center

Căciulați, Ilfov, Romania

27,100 m² strategic hub specialising in storage and assembly of large-scale energy infrastructure. Rail-connected facilities for BESS and hydrogen technologies to optimise global supply chains.

27,100 m² rail-connected
Data Centers EI Hyperscale Datacenter
Future · 2030

EI Hyperscale Datacenter

Romania

200 MW AI-optimized facility establishing a regional hub for high-density GPU computing. Designed for 100% renewable energy by 2027, full build-out by 2030. 50 MW modular phases, Tier III+ reliability.

200 MW (50 MW / phase)
Hydrogen Danubian H₂ Blue Line
Future · 2030

Danubian H₂ Blue Line

Tulcea County, Romania

Central engine for the Danubian H₂ Blue Line — 300 MW solar park, 200 MW BESS, and a scalable hydrogen electrolyzer. Decarbonises river transport and regional industry at the Danube-Black Sea junction.

300 MW PV + 200 MW BESS + H₂
No projects match your search. Try a different keyword or reset the filters.

We have more in the Pipeline

Our pipeline includes 7+ disclosed projects. Additional sites are under NDA. Qualified investors and partners get access to the full deal flow.

Let’s Talk

Evaluating a co-investment?

Full project data rooms, bankable financial models, and site visits are available for qualified institutional investors under NDA.